Medallion Cabinetry, Independence OR

Built with tilt-up concrete with a steel roof structure, this new 204,000 square foot manufacturing facility was completed on a fast-track design approach in less than seven months. The structural design accommodates future growth in two directions, plus allows for the creation of another 40,000 square feet of mezzanine area.