FRERES PLYWOOD STORAGE BUILDING
CD Redding was involved from the pre-construction phase, collaborating closely with the engineer and owners. CDR’s experienced team analyzed constructibility and identified efficiencies in both materials and scheduling. A key priority was eliminating the need for expensive large metal plates at connection points. Structural members underwent various CNC processes to create pockets, slots, and saddles,…