UGM SIMONKA PLACE

The addition and interior remodel to the front of Simonka Place provides much needed administrative offices, four new accessory counseling offices in support of the shelter, barrier-free restrooms, family development room, and a welcoming entry lobby area. The interior remodel was completed in two phases, allowing residents and staff to remain onsite throughout construction. Phase…

WITHNELL FAMILY YMCA

Faced with increased costs of operating and maintaining a 92-year-old building, the Salem Family YMCA partnered with CD Redding to build a new 3-story, state-of-the-art community center on their existing downtown site across from the Oregon Capital Mall. This project began with the demolition of existing structures along with the environmental mitigation of on-site tanks…

BETHEL CHURCH

Another seamless partnership between Building God’s Way (BGW) and CD Redding Construction designed and built this state of the art church facility with fully automated lighting controls and HVAC systems. At the core of the building is a 6,903 sq. ft. multi-purpose room which transitions from a santuary to a full sized basketball court or…

OUR SAVIOR’S LUTHERAN

Where function meets intricate design. Exceptional wood trim work was added to make for a beautiful space without interfering with use. CD Redding Construction built this new church facility to include a multipurpose room with a full-size kitchen and an administrative and educational wing to accommodate a comprehensive Christian education program. Project Facts 38,000 sq.…