FRERES MASS PLY TILT

CD Redding was involved from the pre-construction phase, collaborating closely with the engineer and owners. CDR’s experienced team analyzed constructibility and identified efficiencies in both materials and scheduling. A key priority was eliminating the need for expensive large metal plates at connection points. Structural members underwent various CNC processes to create pockets, slots, and saddles,…

OPENROAD GLOBAL

The new addition is a beautifully designed office space with two state-of-the-art conference rooms, an additional employee break room, and a vibrant outdoor area for relaxation and collaboration. This two-story addition was added to the north side of the existing office building. The existing structure’s exterior was given the same design features as the addition,…

WITHNELL FAMILY YMCA

Faced with increased costs of operating and maintaining a 92-year-old building, the Salem Family YMCA partnered with CD Redding to build a new 3-story, state-of-the-art community center on their existing downtown site across from the Oregon Capital Mall. This project began with the demolition of existing structures along with the environmental mitigation of on-site tanks…