FRERES MASS PLY TILT

CD Redding was involved from the pre-construction phase, collaborating closely with the engineer and owners. CDR’s experienced team analyzed constructibility and identified efficiencies in both materials and scheduling. A key priority was eliminating the need for expensive large metal plates at connection points. Structural members underwent various CNC processes to create pockets, slots, and saddles,…

MAPS CREDIT UNION – ADMINISTRATION BUILDING

The complete remodel of the four-story Maps Credit Union administration building focused on modernizing infrastructure and enhancing employee experience. Major upgrades to the HVAC system including removal and installation of two new massive rooftop units, delivering improved functionality and energy efficiency. Interior Renovations: Several office entrances were upgraded to a sleek modern style which showcases…

OPENROAD GLOBAL

The new addition is a beautifully designed office space with two state-of-the-art conference rooms, an additional employee break room, and a vibrant outdoor area for relaxation and collaboration. This two-story addition was added to the north side of the existing office building. The existing structure’s exterior was given the same design features as the addition,…